The treatment plant should be located as near to the point of disposal as possible. If the sewage as to be disposed finally in to the river, the plant should be located near the river bank. Care should be taken while locating the site that it should be on the downstream side of the city and sufficiently away from water intake works. If finally the sewage as to be applied on land, the treatment plant should be located near the land at such a place from where the treated sewage can directly flow under gravitational forces toward the disposal point.