Doprava zdarma se Zásilkovnou nad 1 499 Kč
PPL Parcel Shop 54 Balík do ruky 74 Balíkovna 49 GLS 54 Kurýr GLS 74 Zásilkovna 49 PPL 99

Cost Analysis Between Saber and Design Bid Build Construction

Jazyk AngličtinaAngličtina
Kniha Brožovaná
Kniha Cost Analysis Between Saber and Design Bid Build Construction Elwood Henry
Libristo kód: 08244261
Nakladatelství Biblioscholar, listopadu 2012
The majority of Air Force construction performed by two main contractual methods, Design Bid Build (... Celý popis
? points 150 b
1 502 včetně DPH
Skladem u dodavatele Odesíláme za 15-20 dnů

30 dní na vrácení zboží


Mohlo by vás také zajímat


TOP
Psychology of Love Sigmund Freud / Brožovaná
common.buy 333
Imperium USA Daniele Ganser / Brožovaná
common.buy 565
Sissy Husband Stories Mistress Jessica / Brožovaná
common.buy 178
Elf Bane: A Tale of the Dwemhar J. T. Williams / Brožovaná
common.buy 222
Political Handbook of the World 2015 Tom Lansford / Pevná
common.buy 11 401
Připravujeme
Chinese Policing Kam C. Wong / Pevná
common.buy 2 639
60 Miles,17000 Miles Digby Asterrne / Brožovaná
common.buy 485
Dance In the Dark Stacy Fulton / Pevná
common.buy 646
Der Gertelbach (Puzzle) Thomas Herzog / Hra
common.buy 764
Wolf In Sheep's Clothing Odell Sexton / Brožovaná
common.buy 323
Timeman Peter L Russell / Brožovaná
common.buy 436
grosse Gauklerin Carry Brachvogel / Pevná
common.buy 830
Defining Our National Cyberspace Boundaries Jeffery R Schilling / Brožovaná
common.buy 1 502

The majority of Air Force construction performed by two main contractual methods, Design Bid Build (DBB) and Simplified Acquisition of Base Engineering Requirements (SABER). DBB is the traditional contracting method where each project is competitively bid. SABER uses one contractor to complete multiple projects over the duration of the contract, using unit prices established in the original contract. The purpose of this research project was to perform a cost analysis between DBB and SABER construction. The research involved finding appropriate projects completed by the two methods that were comparable. This involved going to Wright-Patterson and Holloman Air Force Bases to gather project information. There were a total of 46 projects collected from both bases. Then a methodology was developed to compare the projects collected. Projects were divided into categories containing similar types of construction. Data from the project was then used to calculate a unit cost per dimensional characteristic for the project. Project comparability was demonstrated by showing that the group of projects constructed by each method completed a similar type and scope of work. Time and cost growth were also compared for DBB versus SABER. The research findings showed that SABER was cheaper but not at a statistical level of significance. The comparison could only be completed in one area of construction, interior renovation, due to the limited number of comparable projects in the remaining construction categories. SABER construction also performed better in cost and time growth for most instances.

Informace o knize

Plný název Cost Analysis Between Saber and Design Bid Build Construction
Autor Elwood Henry
Jazyk Angličtina
Vazba Kniha - Brožovaná
Datum vydání 2012
Počet stran 168
EAN 9781288332786
ISBN 9781288332786
Libristo kód 08244261
Nakladatelství Biblioscholar
Váha 313
Rozměry 189 x 246 x 9
Darujte tuto knihu ještě dnes
Je to snadné
1 Přidejte knihu do košíku a zvolte doručit jako dárek 2 Obratem vám zašleme poukaz 3 Kniha dorazí na adresu obdarovaného

Přihlášení

Přihlaste se ke svému účtu. Ještě nemáte Libristo účet? Vytvořte si ho nyní!

 
povinné
povinné

Nemáte účet? Získejte výhody Libristo účtu!

Díky Libristo účtu budete mít vše pod kontrolou.

Vytvořit Libristo účet