Doprava zdarma se Zásilkovnou nad 1 499 Kč
PPL Parcel Shop 54 Balík do ruky 74 Balíkovna 49 GLS 54 Kurýr GLS 74 Zásilkovna 49 PPL 99

Anglesey Railways Through Time

Jazyk AngličtinaAngličtina
E-kniha Adobe ePub
Nakladatelství Amberley Publishing, února 2014
A railway arrived on Anglesey in 1848, linking London and Dublin. It was the great railway engineer... Celý popis
? points 35 b
345 včetně DPH
Skladem Ihned ke stažení


Mohlo by vás také zajímat


Always Audrey Iconic Images / Pevná
common.buy 942
Cantata Ursula Mamlok / Noty
common.buy 820
Climate Smart Agriculture Leslie Lipper / Adobe ePub
common.buy 109

A railway arrived on Anglesey in 1848, linking London and Dublin. It was the great railway engineer Robert Stephenson who ensured that the railway link to Ireland would run along the North Wales coast to Holyhead when he presented plans that overcame the engineering challenges associated with the route. A branch was subsequently built from Gaerwen to Amlwch after the LNWR absorbed the CHR. This Anglesey Central Railway was first opened in around 1865 and completed in 1867. The LNWR won the contract to carry the Royal Mail by rail, but it was the City of Dublin Steam Packet Company that carried the mails across the Irish Sea. The LNWR did, however, build a magnificent inner harbour in the 1880s. The railway still runs from London to Holyhead and boats continue to sail from Holyhead to Ireland, but today only the Llanfair P.G., Valley (which serves the RAF base) and Holyhead stations remain.

Darujte tuto knihu ještě dnes
Je to snadné
1 Přidejte knihu do košíku a zvolte doručit jako dárek 2 Obratem vám zašleme poukaz 3 Kniha dorazí na adresu obdarovaného

Přihlášení

Přihlaste se ke svému účtu. Ještě nemáte Libristo účet? Vytvořte si ho nyní!

 
povinné
povinné

Nemáte účet? Získejte výhody Libristo účtu!

Díky Libristo účtu budete mít vše pod kontrolou.

Vytvořit Libristo účet